FINANCIAL DATA

 
Project
Percentage
Cost in GRD
1. Topside Landfills 2,50% 67.791.439
2. Ripraps 11,60% 314.552.275
3. Caisson from concrete 59,00% 1.599.877.951
4. Artificial Blocks 11,90% 322.687.248
5. Marina superstructure 1,70% 46.098.178
6. Quay-wall superstructure paving stone 3,80% 103.042.987
7. Quay-wall superstructure equipment 3,10% 84.061.384
8. Architectural formations 1,50% 40.674.863
9. Technical works from concrete 4,60% 124.736.247
10. Geotechnical works 0,30% 8.134.973
  Total 100,00% 2.711.657.544