Introduction | Selection of number of berth | Marina
 
 

LAND SURVEY

The land survey that was carried out aimed at:
  • Determining the location of the project
  • Determining the necessary berths for car ferries and cruise ships
  • Determining the capacity of the marina

As mentioned in the introduction above, Tourlos bay was chosen as the most suitable area for the construction of the new port.

 
Location of the New Port

Technical studies

Project construction

Timeschedule

Financial data