CONNECTING BRIDGE

Connection of the artificial island with the coastal zone is achieved through a bridge. The bridge is 44.28-m wide and 41.38-m long, allowing the design of a total of six lanes. Two of them will serve the quay walls of cruise ships in the western part, and the other four will serve traffic from and to car ferries and the future planned marina.
Zoom
Bridge top view
Zoom
Deck and Columns with bridge
It is constructed at an adequate height, so as to allow the transit of small boats from one basin to another. It also allows the circulation and renewal of waters from both formed basins.
The bridge deck is seated on columns of artificial blocks. Slabs supported at both ends with concrete built in-sites with the aid of sliding steel formworks was choosen as the most practical mode of construction.